We Build, Maintain and Overhaul all kinds of rail tracks. We maintain an active Plate Laying and Maintenance Unit b Flash butt welding unit and c a thermit welding unit.Joints welding – Includes cost of Labour, Equipment, Material, Logistics and supervision
All works – Includes equipment, machinery, tools, PPE, logistics and supervision Includes the cost of Labour, Equipment, Material, Logistics and supervision Includes equipment, machinery, tools, PPE, l.ogistics and supervision.
ITEM NO |
QUANTITY |
UNIT OF MEASURE | ACTIVITY HEAD/DESCRIPTION | RATE [KSHS] | TOTALS |
1 | Each | Re-sleepering, per sleeper | 2,800 | ||
2 | Metre | Transposing side worn rails | 980 | ||
3 | Metre | Cess building, both sides of the track | 1,760 | ||
4 | Crib | Scarify, [screening of ballast] | 2,830 | ||
5 | Each | Joints packing, full sleeper length | 1,630 | ||
6 | Metre | Creep pulling, K type sleeper | 640 | ||
7 | Metre | Creep pulling, Pandrol sleeper | 620 | ||
8 | Foot | Replacing turnout timber sleepers | 260 | ||
9 | Foot | Replacing viaduct timber sleepers | 320 | ||
10 | Foot | Replacing timber sleepers on open bridges | 300 | ||
11 | Each | Loading steel sleepers | 240 | ||
12 | Each | Offloading steel sleepers | 200 | ||
13 | Foot | Loading timber sleepers | 220 | ||
14 | Foot | Offloading timber sleepers | 220 | ||
15 | Metre | Cleaning drainage | 300 | ||
16 | Metre | Geometry correction | 420 | ||
17 | Metre | Weeding on active lines { normal growth} | 370 | ||
18 | Metre | Weeding on active lines { overgrowth of vegetation and grass} | 450 | ||
19 | Metre | Bush clearing | 270 | ||
20 | Foot | Stacking timber sleepers | 280 | ||
21 | Each | Stacking steel sleepers | 220 | ||
22 | Each | Beaconing of curves | 140,000 | ||
23 | Tons | Stacking of rails | 5,600 | ||
24 | Metre | Dressing/ boxing of ballast | 2,390 | ||
25 | Foot | Geometry correction, turnout sleepers | 392 | ||
26 | Tons | Re-railing, due to wear, accidents etc. | 6,300 | ||
27 | Each | Joint welding, Thermit | 28,650 | ||
28 | Each | Joint welding, Flash butt | 14,600 | ||
29 | Each | Joint welding, Gas pressure | 13,000 | ||
30 | Kilometre | Joint track inspection | 1,300 |