Maintenance Services

We Build, Maintain and Overhaul all kinds of rail tracks. We maintain an active Plate Laying and Maintenance Unit b Flash butt welding unit and c a thermit welding unit.Joints welding – Includes cost of Labour, Equipment, Material, Logistics and supervision

All works – Includes equipment, machinery, tools, PPE, logistics and supervision Includes the cost of Labour, Equipment, Material, Logistics and supervision Includes equipment, machinery, tools, PPE, l.ogistics and supervision.

                 ITEM NO  

QUANTITY

  UNIT OF   MEASURE          ACTIVITY HEAD/DESCRIPTION  RATE [KSHS]  TOTALS
 1  Each  Re-sleepering, per sleeper  2,800
 2  Metre  Transposing side worn rails 980
 3  Metre  Cess building, both sides of the track 1,760
 4  Crib  Scarify, [screening of ballast] 2,830
 5  Each  Joints packing, full sleeper length 1,630
 6 Metre  Creep pulling, K type sleeper 640
 7  Metre  Creep pulling, Pandrol sleeper 620
8  Foot  Replacing turnout timber sleepers 260
 9  Foot  Replacing viaduct timber sleepers 320
 10  Foot  Replacing timber sleepers on open bridges  300
 11  Each  Loading steel sleepers 240
 12  Each  Offloading steel sleepers 200
 13  Foot  Loading timber sleepers 220
 14  Foot  Offloading timber sleepers 220
 15  Metre  Cleaning drainage 300
 16  Metre  Geometry correction 420
17 Metre Weeding on active lines { normal growth} 370
18 Metre Weeding on active lines { overgrowth of vegetation and grass} 450
19 Metre Bush clearing 270
20 Foot Stacking timber sleepers 280
21 Each Stacking steel sleepers 220
22 Each Beaconing of curves 140,000
23 Tons Stacking of rails 5,600
24 Metre Dressing/ boxing of ballast  2,390
25 Foot Geometry correction, turnout sleepers  392
26 Tons Re-railing, due to wear, accidents etc. 6,300
27 Each Joint welding, Thermit 28,650
28 Each Joint welding, Flash butt 14,600
29 Each Joint welding, Gas pressure 13,000
30 Kilometre Joint track inspection 1,300