TRACK GEOMETRY TECHNOLOGY

CLEARANCE & STRUCTURE TECHNOLOGY

1-2-2

LASER SURVEY RECORDER MEPHISTO

The Mephisto offers you precise track positional measurement taking reference from marker posts or fixed infrastructure to calculate track line and level. It can also be used to measure the position of OHL. These operations are achieved by means of a swivelling laser fitted with an accurate screw-adjuster.The operation of the Mephisto trolley can be intuitively controlled by the ergonomic wired remote keypad. This unit consists of light and easily assembled elements that are stored and transported in its customised transit case

RAIL GEOMETRY TECHNOLOGY

1-4-1

PORTABLE ELECTRONIC STRAIGHTNESS MEASURER RECTIRAIL DL2

The Rectirail DL2 provides you with an easy and reliable way to measure rail head straightness. Using the ergonomic joystick and two control buttons on its frame, it offers you a simple way to acquire and store data. The Rectirail DL2 is connected by Bluetooth technology to an Android GPS-enabled rugged smartphone, while the data displayed and stored on the device can be easily transferred to a PC for later analysis. Two magnetic pins allow you to perfectly position the unit on the rail allowing the 100 sensors (over a 1-metre base) to provide accurate measurements at the push of a button.

1-1-1

DIGITAL TRACK GAUGE FOR GEOMETRY MEASURING

This gauge provides you with precise measurements with a clear display preventing operator misinterpretation.You will find this light gauge very easy to use thanks to a smart interface which displays the measured readings on the integrated screen.You will find this gauge perfect in all circumstances being waterproof, fully insulated and suitable for all types of track even in a 3rd rail environment

2-1-2

DIGITAL TRACK GAUGE FOR GEOMETRY MEASURING & RECORDING
GARNET-DL

This gauge provides you with precise measurements with a clear display preventing operator misinterpretation.The measurements are displayed on the smartphone screen using Bluetooth technology, while the measurements are also registered and stored for later analysis on your computer.You will find this gauge perfect in all circumstances being waterproof, fully insulated and suitable for all types of track even in a 3rd rail environment

3-1-1

ROLLING TRACK GAUGE AMBER

You will find using the PSR to be the most simple method to change or to move rails laterally due to an efficient design.It offers you user-friendly operation with its lightweight and robust design but is easily adjustable for a good working height and horizontal positioning.Suitable for all environments, its versatile design assures you perfect operation with any flat bottom or grooved rails.

4-1-2

TRACK GEOMETRY & SWITCH GEOMETRY DIGITAL MEASURING AND RECORDING PORTABLE TROLLEY DIAMOND-S2

The unit offers you a fully portable track geometry recording system. The laser system determines the exact measuring point on the rail and the onboard GPS function determines the exact track location.The integrated touch screen computer is convenient and operator friendly. The built-in hard drive stores collect data you to transfer it to another PC using a USB port.The trolley together with the PC can be folded for storage in a convenient transport case. Due to its lightweight, the trolley can be carried by 1 person and set up for operation within 2 minutes.

8-1

GEOMETRY TRACK GAUGE FOR TRACK AND TURNOUTS RCFF & RCA

Accurate, RCFF for track or RCA for track and turnouts is a sturdy and lightweight track tool that allows you a quick reading of track gauge and cant on protected graduated rules.RCA gauge allows you as well to take your measurement in grooves, and guide rails dimensions from check rail to crossing and from check rail to check rail.Easily transportable and supplied with a transporting case on request, the anodised aluminium channel section protects all sensitive parts.

5-1-2

RAIL INCLINATION GAUGE JET

This unit offers you a safe, simple and ergonomic method to accurately measure your rail inclination.The accuracy is guaranteed by a powerful microcontroller and by means of the adjustments allowing a perfect device positioning.Data transfer, through a Bluetooth connection for a full display and storage on a dedicated Android smartphone

7-3

LASER ALIGNMENT SYSTEM OPAL MINI

This very compact device offers you a modern method to measure track level and line to aid track measurement and hand tamping operations. It is stored in a dedicated protective case.Your operator can fit this unit to the rail in seconds.Spirit level indicators mounted on both modules assist your operator to ensure a perfectly horizontal position before work (independent of the inclination of the rail) ensuring accurate readings.

RAIL WEAR TECHNOLOGY

1-2-1

LASER PROFILOMETER PROFILRAIL

Lightweight, portable and self-contained, the profile rail is easily installed allowing you to quickly carry out any rail profile measurement. A simple push button and the rotary laser will ensure an accurate and precise measurement. The data will be automatically transferred to your smartphone/pda allowing you to deal with the measurement and print profile immediately. All data formats are compatible with M.S Excel.ProfilRail has been designed to take accurate measurements even in the severe site and climatic conditions having a damp/dust protective rating of IP 42

ULTRASONICS TECHNOLOGY

2-5

ELECTRIC POWERED TROLLEY FOR ULTRASONIC RAIL FLAW DETECTION
EGO-US

The electric-powered UT inspection unit model EGO-US offers high-performance rail inspection with greater autonomy from its set of 6 batteries. It offers simultaneous inspection of both rails. The rail defect inspection system includes 18 probes (9 per rail) offering a range of testing options to ensure comprehensive inspection of the rail condition. An onboard PC with a touchscreen mounted on the trolley frame collects data, displaying it in graphic form and saving to memory for later analysis..Our dedicated rail flaw inspection software allows for further analysis of any rail defects.

ULTRASONICS TECHNOLOGY

1-5-300x189

TROLLEY FOR ULTRASONIC INVESTIGATION OF RAIL DEFECTS FILUS X17 & X27

The Filus X17 & X27 enable a single operator to carry out continuous NDT rail testing with a small portable trolley.Our ultrasonic inspection trolleys include 9 separate probes orientated at different angles for each rail, which offer you accurate identification of a full range of defects such as kidney-shaped defects, star cracks, vertical cracks in the weld, porosity, corrosion defects and many more on-board computer system comes with integrated GPS display for the localisation of any defects found. Therefore, it assists your operator in returning to the location of the suspected defect.Our dedicated rail flaw inspection software allows for further analysis of any rail defects

4-4

TRACK SWITCH LAYING SYSTEM SPAC SYSTEMS

The versatility of this system offers you the operational capability to combine some of these elements for other track laying systems (such as PEM XL / LEM or S2PV) to suit various track-laying methods. Its modular conception enables to installation up to 45 meters/45 tons of switches with a very high degree of safety for the operator thanks to the remote control..The high output performance of the SPAC system offers you the advantage of installing a switch in less than an hour.

5-3

HYDRAULIC GANTRIES FOR TRACK LAYING AND RENEWAL PTH 350 & 500

The hydraulic gantries model PTH ensures an efficient track laying methodology to achieve a high output up to 450 meters per hour of new track or up to 350 meters in case of track renewal. With a powerful lifting capacity of up to 30,000 daN per pair, the range of hydraulic gantries model PTH can easily handle all track panels up to 36 meters and can handle up to 60 concrete sleepers with a dedicated sleeper beam. Versatile with a large choice of sleeper beams equipped with either chains or hydraulic paddles suitable for all kinds of sleepers, timber, concrete or steel Suitable for all gauges, the simple and robust design of the PTH incorporates a high level of safety to ensure the security your operators as well as ensuring low maintenance costs The PTH gantries are easily transported on-site using rotating turrets installed on a flat wagon and compatible with most railway gauges

6-3

LWR MOBILE UNLOADING SYSTEM EMD

The LWR Mobile Unloading System EMD consists of either a rail-road or a rail bounded trailer which is connected via an adjustable tow bar to a Long Welded Rails Wagon on which is mounted a wagon end guiding assembly. A second adjustable tow bar connects a forward guiding trolley to the road-rail trailer.
Easy to operate, the road-rail version of the EMD gives you access to the worksite by road or by rail Autonomous and un-reliant on the rail transporting train the EMD is an efficient way to unload long welded rails During operation, the rails are continually guided and can be unloaded into 3 possible positions depending on local standards.

ROLLING STOCK

1-1-2

TRACK AND CATENARY MEASUREMENT AND CONTROL TRACK MOTORCAR

VMT & VMB – MT US

The VMT/VMB-MT is an investment in the future of your track allowing you to measure and record all track and catenary parameters, features and structures with minimal track interruption using our high-speed recording systems
The units use enhanced versatility by integrating custom-designed measuring systems within the vehicle to match your infrastructure vehicle records and analyses your data in real-time while measuring, allowing quick interpretation of results.

4-5

TRACK MEASUREMENT AND ULTRASONIC INSPECTION TROLLEY VT438-MT US

A lightweight, self-propelled and versatile solution to automatically control and measure all track parameters. The VT 438 will allow you to perform ultrasonic inspections up to 20 km / h. The user-friendly onboard system will detect and mark rails if integrity defects are detected.The VT438 ensures fast and accurate inspection and recording of track parameters up to a speed of 50 km/h.The cab of the VT438 can transport up to 4 people as well as one driver for in-situ measurement and analysis of results.

2-1-3

SELF-PROPELLED TRACK GEOMETRY TROLLEY SAPPHIRE

This battery-powered unit allows you to achieve constant inspection speed up to 8 kph with 100 km autonomy measuring full track geometry parameters in an environmentally friendly method for unrestricted use in all environments
The Sapphire includes an integrated onboard computer for data collection & display. The computer is totally weatherproof (IP54) with the ability to enter additional information (time, date, climate conditions, track identification, etc…) alongside the standard parameters using its touch screen keyboard.The Sapphire is a simple and accurate tool for providing you with a full track geometry inspection

3-5-150x150

ELECTRIC POWERED TROLLEY FOR ULTRASONIC RAIL FLAW DETECTION EGO-US

The electric-powered UT inspection unit model EGO-US offers high-performance rail inspection with greater autonomy from its set of 6 batteries. It offers simultaneous inspection of both rails. The rail defect inspection system includes 18 probes (9 per rail) offering a range of testing options to ensure comprehensive inspection of the rail condition. An onboard PC with a touchscreen mounted on the trolley frame collects data, displaying it in graphic form and saving it to memory for later analysis. Our dedicated rail flaw inspection software allows for further analysis of any rail defect